Cole Pond Trail Head
After 32 hours over three days moving 17 rocks and setting 6 of them in an abutment, we discovered the bridge at this trailhead is too far gone to save (although safe enough to go on using because it is so low to the water). We reported to F&G, who now will decide how to replace that bridge. Meantime we move on to other jobs.
Cardigan road from west still gated.