2025: 41st Worklog Summary for CHVTC
Eighteen volunteers turned out: 11 had and one earned their tartans. Our 430 hours on trails is 90% of the average of the five years pre-covid: 476 hrs. Admin = 172 hrs, outreach = 20 hrs. DNCR values volunteer labor @ $35.76 / hr, so our 620 hr = $22,171.
We patrolled 17 miles, cleaned 200+ drains, cut 43 blowdowns (bd). We built 180'+ of barricade. We blazed 3.1 miles of Skyland Trail in WHITE. We removed and replaced (R&R) 10 log steps/waterbars: 8' 10' 10' 10' 5' 8' 8' 14' 5' 6' = 84'. We R&R 2 KD 2x8x8' bog bridge planks. We added 10 rock steps. Since August 2024, we cut 30 bd, brushed, blazed WHITE all 7.4 miles of ridgetop trail. That is Mowglis, South Ridge, and Skyland trails. That was 10 days totalling 178 hrs.
On Mt. Cardigan State Forest, 13 blowdowns.
West Ridge Trail, 60 drains x 2, barricade, R&R 6 log steps/bars 8' 10' 10' 10' 5' 8', R&R 2 KD 2x8x8' planks, set 8 rock steps.
114 Hours
South Ridge Trail, 15 drains x 2,15' barricade in zigzag.
21 Hours
Ranger Cabin Trail
2 Hours
Skyland Trail, Briggs relocation, blaze WHITE Woodland-Orange Mtn (13 bd), thence to Rimrock (3 bd), 3.1 mi.
56 Hours
Mt. Cardigan Total 193 Hours
On Mt. Sunapee State Park, 29 blowdowns.
Andrew Brook Trail, 42 drains, 9 bd + 3 leaners.
51 Hours
Solitude Trail (+ w. Newbury + Rim) 10 bd.
35 Hours
Rim Trail (+ e. Newbury) 48 drains, 7 bd.
15 Hours
Mt. Sunapee Total 101 Hours
On Mt. Kearsarge State Forest (Rollins SP, Winslow SP)
Winslow Trail, 30 drains x 2. 150'+ barricade, R&R 8' bar, 14' bar, 5' step. New inventory.
85 Hours
Rollins Trail, 20 drains, 2 pavers, 20' ditch, revetted. Rock waterbar.
17 Hours
Mt. Kearsarge Total 102 Hours
On Cole Pond Trail, Enfield NH for NH F&G, 21 drains x 2, 6' bar, 1 blowdown.
Cole Pond Total 10 Hours
Outreach: WMNF @ SLA, Holderness NH 6 hr. MSAC @ Newbury NH 3 hr. M-SG s. of Bear Pond jct 6 hr, rock wb 5 hr.
Outreach Total 20 Hours
Admin: DNCR Annual work plan 4 hr. Emails 11 hr. 12 CHVTC members @ annual mtg 24 hr. Trailwrights ann mtg 1 hr. MSGTC ann mtg 1 hr, Make 4 blaze boards Andrew Brook Tr 1 hr. DNCR class our 4 sawyers @ 6 hr= 24 hr. Webwright @ 8 hr/ month = 96 hr.Tools 4 hr. This worklog summary 6 hr.
Admin Total 172 Hours
We welcome, support, train, and thank volunteers. We tend and build on 19 miles of trail, and have fun at good quality work with like-minded people, knowing our work will last at least for decades. We add jobs and check off others as we do them. We reach out to other groups, donors, and individuals. If wild lands are worth keeping, the trails need tending.
We offer our help, and we thank you for yours.
Mille taing, beinnanach. Slainte mhath a uile! / A thousand thanks, mountain folk. Good health to all!
Respectfully submitted,
Craig Sanborn, CHVTC
Trailmaster